Assets Group · Financial Headquarters

Full-height acoustic glass partition installation across the executive floors of the Assets Group financial headquarters.

Project 01 · Executive Interior Glazing · Lusail, Qatar · 2026

Assets Group · Financial Headquarters, executive interior glazing, Lusail, Qatar

Project record

Client
Assets Group
Location
Lusail, Qatar
Year
2026
Application
Executive Interior Glazing
Finish / condition
Black Anodised · Double-Height Full-Glazed
Reference
AG-2026-001

The brief

Enclose the boardroom, meeting rooms and management offices of a financial headquarters in full-height glass, including double-height conditions, without giving up speech privacy on the executive floors.

The solution

Silentium 100 double-glazed partitions in a black anodised finish, 100 mm total construction, with Porta doors integrated directly into the partition runs so door and wall share one plane.

Scope of work

Silentium 100 + Porta

  • Executive offices, boardroom, meeting rooms, management offices
  • Silentium 100 system in black anodised frame
  • Porta doors integrated into partition runs
  • Double-height full-glazed enclosures
  • Total construction thickness: 100 mm

Acoustic performance

A laboratory rating describes a tested specimen. A site result describes the finished room. The two are reported separately.

Laboratory rating

Laboratory tested

Silentium 100 laboratory rating: Rw 52 dB (C −1 · Ctr −4), ISO 10140-2 / ISO 717-1:2020, GiB report E260327M1/1_rev00.

Published rating by system

These are the published values for each system and the configuration stated on its system page. They are not measurements taken in this building.

Measured on site

No site acoustic measurement has been published for this project. Figures quoted are the published ratings of the systems, not measurements taken in this building.

What Rw and the test standards mean

Gallery

  • Assets Group · Financial Headquarters: installation view 1
  • Assets Group · Financial Headquarters: installation view 2
  • Assets Group · Financial Headquarters: installation view 3
  • Assets Group · Financial Headquarters: installation view 4
  • Assets Group · Financial Headquarters: installation view 5

Documents for these systems

Test summaries and technical data sheets for the systems installed on this project.

Project consultation

Planning a comparable installation?

The engineering team advises on system selection, acoustic strategy, and phasing from the first concept stage.